It starts in the forest
Spruce from managed forests: a renewable material that keeps its carbon stored for the life of the house.
- Spruce
- Renewable
- Stores carbon
How it's built
Every Timbr home is built from CLT: solid timber panels made in a factory to millimetre tolerances, delivered to site and assembled into a complete structure in days.

01 / 10
Spruce from managed forests: a renewable material that keeps its carbon stored for the life of the house.
The material
Cross-laminated timber is made by gluing layers of kiln-dried spruce boards together, each layer turned 90° to the one below. Panels use an odd number of layers — typically three, five or seven — and are pressed into large, flat elements.
Crossing the grain makes the panel strong and dimensionally stable in both directions, so a single element can act as a load-bearing wall, a floor or a roof. Openings for windows, doors and services are cut by CNC before the panel leaves the factory.
Five-layer CLT panel, shown in section
Why timber
Trees absorb CO₂ as they grow. A Timbr home holds around 40 tonnes of it in its structure, and its embodied emissions are close to half those of a concrete and masonry equivalent.
Panels are cut by CNC from the digital model, so walls are straight, openings are exact and joints are tight — which is what makes high airtightness achievable.
The structure is assembled in days rather than months, with no curing time and far less site waste, noise and traffic.
Solid timber chars slowly and predictably. The char layer protects the panel core, and each element is designed for its required fire resistance.
CLT weighs around a fifth of concrete. Less mass means smaller foundations and lower seismic forces on the building.
Timber buffers humidity, stays warm to the touch and, with the right insulation, keeps the interior stable through summer and winter.
The process
01
Choose your home, finishes, efficiency level and site online, and share the link.
02
Our engineers confirm the site loads, ground and access, and issue a fixed offer with a project LCA.
03
We prepare the permit documentation and support the application with your municipality.
04
CLT panels are produced and CNC-cut while foundations are prepared on site.
05
The structure rises in under two weeks, followed by envelope, services and finishing.